CCTV Hub, East Renfrewshire

Project: East Renfrewshire CCTV Hub
Client: PMCL
Value: £5k
Award Date: July 2015
Completion Date: August 2015

Skyform were contracted by PMCL to take concrete core cutting samples and carry out concrete repair works on a CCTV hub.

The works consisted of:

  • Application of 100mm wide perimeter band 800x700mm at rear vents
  • 150x300mm treat rebar and carry out repair to rear elevation
  • 600x500mm treat rebar and carry out repair to rear elevation
  • 200x200mm infill hole at redundant outlet to rear elevation
  • 100x100mm infill hole at redundant outlet to rear elevation
  • 50x50mm infill hole to rear elevation
  • Crack repairs; rake out crack to rear elevation and carry out concrete repairs
  • 100x100mm infill hole at redundant outlet at vent to side elevation
  • 200x200mm infill hole at redundant outlet to side elevation
  • Provision of consumable items; plant, tools and fuel etc.